Requirements of Continuous Bridge Deck Paving on Curb Slipform Paver
release time:2020-5-30 10:17:16      hit count:1871

In order to realize continuous pavement of bridge deck by curb slipform paver, it is one of the necessary conditions to ensure the construction machinery and equipment that can pave the bridge deck.  First of all, the lateral formwork on the kerbstone slip-form paver can meet the requirements of the thickness of the thin reinforced concrete surface layer on the bridge deck, and the continuous steel bars, hanging ring steel bars, steel mesh, expansion joints and expansion joints on the bridge are proofread, which may block the slip of the lateral formwork of the kerbstone slip-form paver.  In particular, the blocking and advantage of the transverse complete continuous steel mesh on the bridge deck is that the movable height of the side formwork is only 5cm. Therefore, the side formwork must be a movable lifting type side formwork, which can be lifted to a zero position flush with the extrusion plate.  If there is a lengthened side formwork hanging behind the machine, it must also meet the thickness requirements of the paved bridge deck.

壓縮600.jpg

The bridge deck pavement of some expressways in our country has been damaged in a very short period of time. One of the most important reasons is that the thickness difference between the longitudinal and transverse pavement layers is too large. The longitudinal pre-stressed reverse arch is too large, some of which are more than 5cm and not less than 3-4 cm after pavement.  Transverse in precast reinforced concrete beam, not in the flange plate precast transverse slope, in the beam transverse flange plate between the wet joint, there is a transverse 2-4cm steps, in this case, the beam itself is not balanced in the vertical and horizontal direction, loss of pavement thickness of 2-4cm.  From the perspective of construction control, the minimum pavement thickness is 20cm, which is of great value to ensure the quality of actual bridge deck pavement.


During the construction process, the walking position of the planned kerbstone slipform paver for bridge deck pavement should be reserved, especially for central isolated expressways and grade I highway bridges.  First of all, the crawler of the two-lane large kerb slipform paver cannot travel in the central isolation and emptying position, nor at the outer edge of the main girder flange plate.  Secondly, the bridge engineering should divide the bridge deck paving work into kerbstone slipform pavers for road surface construction. At the same time, the guardrails on the bridge must be made after the kerbstone slipform pavers pave the bridge deck. Otherwise, the bridge railings will block the tracks of the kerbstone slipform pavers and have no paving position.


Previous: No more
Next: No more

Back to list

News you are interested in
蜜臀av一区二区三区免费观| 强奷很舒服好爽好爽| 青青视频在线人视频在线| 黑人大鸡巴日小逼| 久久久久国产AV成人片| 视频一区二区三区日韩视频| 二次元男生操女生屁眼爽| 日韩激情精品久久久一区二区| 熟妇好大好深好爽| 加勒比在线不卡一区二区观看| 骚逼被狂插视频教程| 看人妻仑乱A级毛片| 中文字幕乱码一区二区三区麻豆| 97人人澡人人爽人人揉| 色橹橹欧美在线观看视频高清免费| 欧美黄色三级成人小视频| 亚洲国产成久久成人综合一区| 亚洲一区二区三区四区国产| 中文字幕av一区二区三区蜜桃| 老司机精品免费在线视频| 精品国产99亚洲一区二区三区| 一级e片在线观看| 精品久久av免费一区二区三区| 成人毛片一级特黄| 淫荡扣逼骚逼视频| 色偷偷影音先锋男人av| 老司机免费福利午夜入口| 色狠狠久久av北条麻妃| 为什么搜索不到裸体| 69国产成人综合久久精| 国产大码丝袜老熟女av| 亚洲人成在线不卡网| 挺进绝色邻居的紧窄小肉| 大鸡巴插入阴道视频| 精品国产自在久国产应用| 亚洲乱熟女一区二区三区| 欧美精品国产一区二区在线观看| 鸡巴和逼中国美女| 大鸡扒干美女BB直流水| 国产午夜福利片无码视频| 亚洲日韩不卡一区二区三区|